FLIN FLON MINING DISTRICT



Success Rate

Over 50% of deposits have been advanced to production, totaling 32 mines which have led to 86 consecutive years of mining

Infrastucture

Over $1.6 billion invested towards mine development with road, rail, power and water infrastructure to facilitate quick development of new discoveries

Timelines And Capex

Typically less than six years from discovery to development with reduced capital expenditures


Recent discoveries have typically been larger in size and deeper than previously discovered


PINE BAY PROJECT


  • Strategic location 16km to HudBay’s Flin Flon processing facilities, which has less than four years of supply remaining

  • Fast-track potential, vertical shaft and underground workings permitted for mining activities

  • Two emerging discoveries, both zones open for expansion along strike and at depth

  • Previously controlled by majors, individual claim areas held by Placer Dome, Inmet, Newmont and HudBay

FLIN FLON PROJECT


  • Large 2,455 ha property, 100% ownership subject to 2% NSR

  • Located within 5km via highway to the Flin Flon concentrator

  • Strategic land position with limited historic drilling surrounded by HudBay claims

  • 2012 airbourne survey identified several prospective geophysical targets

CONTACT US


Callinex Mines Inc.

604.605.0885
info@callinex.ca
http://www.callinex.ca

Corporate Head Office
1555 – 555 West Hastings Street
Vancouver, BC Canada V6B 4N6


President, CEO and Director:
Max Porterfield

Corporate Counsel:
Northwest Law Group

Auditors:
Davidson & Company LLP


Sign up and receive the latest Callinex news.